午夜免费成人-午夜免费r级伦理片-午夜免费-午夜美女影院-午夜美女写真福利写视频-午夜美女网站

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.qefxinting.cn

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 亚洲妇女无套内射精| 欧美高清精品一区二区| 无码av免费一区二区三区试看| www.黄色免费| 又色又爽又高潮免费视频观看| 污污的黄色小说| 亚瑟国产精品久久| 深夜放纵内射少妇| 精品一区二区三区免费视频| 日本丰满熟妇videossex| 国产午夜人做人视频羞羞| 美女视频性感网站黄色| 三级黄色a| 国产精品白浆无码流出| 人人妻人人澡人人爽欧美二区| 996久久国产精品线观看| 国产av精国产传媒| 五月激情网站| 精品国产粉嫩内射白浆内射双马尾| 狠日狠干日日射| 三级不卡| 国产白嫩护士被弄高潮| 变态另类先锋影音| 国产精品jizz在线观看无码 | 亚洲精品国产精品制服丝袜| 免费看美女被靠到爽的视频| 日日摸夜添夜夜夜添高潮| 中文字幕天天躁夜夜狠狠综合 | 亚洲一区免费视频| 欧洲人妻丰满av无码久久不卡| 久久夜色tv网站免费影院 | 亚洲综合天堂av网站在线观看| 美女国产视频| 蜜臀av999无码精品国产专区| 国产乱对白精彩| 毛片视频免费网站| 精品无码中文字幕在线| 伊人婷婷色香五月综合缴缴情| 天堂资源在线官网资源 | 亚洲精品久久夜色撩人男男小说| 免费一区二区|