午夜免费成人-午夜免费r级伦理片-午夜免费-午夜美女影院-午夜美女写真福利写视频-午夜美女网站

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.qefxinting.cn

當前位置:首 頁 ? News ? Industry trends

Six steps to choose the right machine for vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發表時間:2020-07-06

1. Obtain: Whether the "mold opening stroke" and "mold support stroke" are enough to take out the finished product depends on the mold and the finished product. The opening stroke of the mold should be at least twice the height of the finished product in the direction of mold opening and closing, and should include the gate length. The stroke of the mold support should be sufficient to launch the finished product;


2. Shoot well: "Screw compression ratio" and "shooting pressure" are determined by plastic. Some engineering plastics require a higher injection pressure and a suitable screw compression ratio design to obtain better molding results. Therefore, in order to make the finished product shoot better, the injection pressure and compression ratio should also be considered when selecting the screw. In general, a screw with a smaller diameter can provide a higher injection pressure.


3. Choose the appropriate model: the model and series are determined by the product and plastic. Because there are many types of injection machines, it is necessary to correctly determine at the beginning which injection machine or series should be used to produce this product, such as general thermoplastic or bakelite raw materials or polyester raw materials, they are single color, double color, multi Color, sandwich color or mixed color. In addition, some products require high stability (closed loop), high precision, high rate of fire, high ignition pressure or rapid production (multi-loop). The appropriate series must be selected for production.


4. Coordination: According to the size of the mold, determine whether the "large column inner distance", "mold thickness", "small mold size" and "template size" of the machine are suitable to confirm whether the mold can fit. The width and height of the mold should be less than or at least one side should be less than the distance between the large columns. The width and height of the mold are preferably within the size range of the template; the thickness of the mold should be between the thickness of the injection molding machine. The width and height of the mold should meet the small mold size recommended by the injection molding machine, and it is too small; so far, the specifications of the mold clamping device have been initially determined, and the tonnage of the model has been roughly determined. Then, the following steps must be performed to confirm which injection unit has a screw diameter that meets the requirements.


5. Shoot fast: and confirm the "shooting speed". Some finished products require high injection rate and high speed to be stable, such as ultra-thin finished products. In this case, it may be necessary to confirm whether the machine's injection rate and injection rate are sufficient, and whether it is necessary to match the pressure accumulator, closed loop control and other devices. In general, under the same conditions, a screw capable of providing a higher ignition pressure usually has a lower ignition rate. On the contrary, a screw capable of providing a lower ignition pressure usually has a higher ignition rate. Therefore, when selecting the screw diameter, it is necessary to consider and select the injection amount, injection pressure, and injection rate (injection speed).


6. Full injection: According to the weight of the finished product and the number of die holes, determine the required "injection amount" and select the appropriate "screw diameter". When calculating the weight of the finished product, the number of die holes (a few holes per die) should be considered; for stability, the injection volume should be greater than 1.35 times the weight of the finished product, that is, the finished product weight should be within 75% of the injection volume;

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 亚洲精品国产av天美传媒| 国产亚洲精品久久久性色情软件| 国产96在线 | 欧美| 2018天堂视频免费观看| 四虎影酷| 免费人成网站在线观看欧美| 男女一区二区三区免费| 久久久久久久综合色一本| 免费人成在线观看网站品爱网| 色久综合网精品一区二区| 亚洲精品午夜无码电影网| 性欧美大战久久久久久久 | 无码人妻一区二区三区在线| 日韩亚洲欧美中文在线| 中文字幕精品av乱码在线| 中文亚洲av片在线观看| www.色老头.com| 欧美丰满熟妇bbb久久久| 亚洲av第一网站久章草| 麻豆人妻少妇精品无码专区| 999久久久无码国产精品| 2021日本三级理论影院| 国产精品亚洲а∨无码播放麻豆| 亚洲国产区男人本色| 亚洲精品午夜国产va久久成人| 国产亚洲中文日本不卡二区| 欧美18videosex性欧美1819| 成人丝袜激情一区二区| 国产片在线观看狂喷潮bt天堂| 一二区成人影院电影网| 五月综合色啪| 牲高潮99爽久久久久777| 国产精品香港三级国产av| 亚洲www美色| 欧美猛少妇色xxxxx| 黑人边吃奶边扎下面激情视频| 插我一区二区在线观看| 看全色黄大色黄大片 视频| 亚洲一级香蕉视频| 久久人妻av一区二区软件| 欧美一级高清免费播放|